J1939 SPN
SPN 2181
J1939 SPN 2181 — Aftertreatment/Emissions parameter
What it means
Aftertreatment 1 SCR Catalyst Reagent Pump Pressure status. The DEF pump is unable to reach or maintain the required pressure for dosing.
Sign in to view symptoms, probable causes, diagnostic steps, severity, and related codes