J1939 SPN
SPN 1443
SCR Reagent Dosing Pressure (Bank 2) Abnormal
What it means
Internal DEF/AdBlue pressure in the second bank dosing system is outside of the operating range.
Sign in to view symptoms, probable causes, diagnostic steps, severity, and related codes